{"title":"New Products","description":"","products":[{"product_id":"4cats-cuddly-cushion-catnip-pillow-toys","title":"4Cats Cuddly Cushion Catnip Pillow Toys","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003e4Cats Cuddly Cushion Catnip Pillow Toys\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eSmall but fine – and with an irresistible aroma of our 4catsnip formula.\u003c\/p\u003e\n\u003cp\u003eOur cotton wool Cuddly Cushion ensures long hours of enjoyment sniffing and playing. Because of the soft filling and manageable size it can be seized between the paws, played with and licked or taken to be cuddled in a quiet place where your furry friend can take in the exciting fragrance in peace. 4catsnip has a very stimulating effect on a lot of cats and ensures that the Cuddly Cushion will be of interest for a long time.\u003c\/p\u003e\n\u003cp\u003eBecause of our top quality processing the cushion with its tried and tested filling of our special formula of catnip, we call it 4catsnip, and cotton wool fleece can stand long, ongoing cuddling sessions. Our Cuddly Cushion measures 7.5 x 10 centimetres and is manufactured to Oeko-Tex® 100 standards in Germany and packed there too. A cuddly cushion to fall in love with – for both you and your cat.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eAvailable in the following pack sizes\u003c\/strong\u003e\u003cbr\u003e Single (1)\u003cbr\u003e Pack of three (3)\u003cbr\u003e Pack of five (5)\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePlease note\u003c\/strong\u003e\u003cbr\u003e Cushions sent will be of a random design and every effort will be made to send all different designs without any duplicates although this cant be guaranteed in every case.\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Catnip filled cotton wool cuddly cushions\u003c\/li\u003e\n\u003cli\u003e Very stimulating effect on a lot of cats\u003c\/li\u003e\n\u003cli\u003e Long hours of enjoyment sniffing and playing\u003c\/li\u003e\n\u003cli\u003eAvailable in multiple pack sizes - random designs\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"4Cats","offers":[{"title":"Single (1)","offer_id":37825957560496,"sku":"4CATS-CUSHIONSX1","price":2.95,"currency_code":"GBP","in_stock":true},{"title":"Pack of three (3)","offer_id":37825957593264,"sku":"4CATS-CUSHIONSX3","price":5.95,"currency_code":"GBP","in_stock":true},{"title":"Pack of five (5)","offer_id":37825957626032,"sku":"4CATS-CUSHIONSX5","price":9.95,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/yhayli2gfeb_9bfba3c7-aa2e-4ef9-940c-6a2f788e1904.jpg?v=1734622714"},{"product_id":"red-dingo-enamel-dog-id-tags-paw-print-11-colours","title":"Red Dingo Enamel Dog ID Tags Paw Print 11 Colours","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Dog ID Tags Paw Print 11 Colours\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\r\n\u003cp\u003eThe Control of Dogs Order 1992 mandates that any dog in a public place must wear a collar with the name and address (including postcode) of the owner engraved or written on it, or engraved on a tag. Your telephone number is optional (but advisable).\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eAvailable in 11 colours\u003c\/strong\u003e - choose from dropdown.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003cbr\u003e \u003cstrong\u003eMedium\u003c\/strong\u003e - 5 Lines - all 16 characters\u003cbr\u003e \u003cstrong\u003eLarge\u003c\/strong\u003e - 6 Lines - all 19 characters\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 3 sizes - small, medium \u0026amp; large\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Dark Blue \/ Small","offer_id":37825959821488,"sku":"1PPNS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Black \/ Small","offer_id":37825959952560,"sku":"1PPBS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Brown \/ Small","offer_id":37825960050864,"sku":"1PPBRS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Red \/ Small","offer_id":37825960149168,"sku":"1PPRS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Orange \/ Small","offer_id":37825960247472,"sku":"1PPOS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Yellow \/ Small","offer_id":37825960345776,"sku":"1PPYS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Small","offer_id":37825960444080,"sku":"1PPGS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue \/ Small","offer_id":37825960542384,"sku":"1PPLBS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Small","offer_id":37825960640688,"sku":"1PPPS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Hot Pink \/ Small","offer_id":37825960738992,"sku":"1PPHPS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Small","offer_id":37825960837296,"sku":"1PPPKS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Blue \/ Medium","offer_id":37825959854256,"sku":"1PPNM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Black \/ Medium","offer_id":37825959985328,"sku":"1PPBM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Brown \/ Medium","offer_id":37825960083632,"sku":"1PPBRM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Red \/ Medium","offer_id":37825960181936,"sku":"1PPRM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Orange \/ Medium","offer_id":37825960280240,"sku":"1PPOM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Yellow \/ Medium","offer_id":37825960378544,"sku":"1PPYM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Medium","offer_id":37825960476848,"sku":"1PPGM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue \/ Medium","offer_id":37825960575152,"sku":"1PPLBM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Medium","offer_id":37825960673456,"sku":"1PPPM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Hot Pink \/ Medium","offer_id":37825960771760,"sku":"1PPHPM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Medium","offer_id":37825960870064,"sku":"1PPPKM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Blue \/ Large","offer_id":37825959887024,"sku":"1PPNL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Black \/ Large","offer_id":37825960018096,"sku":"1PPBL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Brown \/ Large","offer_id":37825960116400,"sku":"1PPBRL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Red \/ Large","offer_id":37825960214704,"sku":"1PPRL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Orange \/ Large","offer_id":37825960313008,"sku":"1PPOL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Yellow \/ Large","offer_id":37825960411312,"sku":"1PPYL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Large","offer_id":37825960509616,"sku":"1PPGL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue \/ Large","offer_id":37825960607920,"sku":"1PPLBL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Large","offer_id":37825960706224,"sku":"1PPPL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Hot Pink \/ Large","offer_id":37825960804528,"sku":"1PPHPL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Large","offer_id":37825960902832,"sku":"1PPPKL","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/kzgeceg2qc3.jpg?v=1736180522"},{"product_id":"red-dingo-enamel-dog-cat-id-tags-camouflage-3-colours","title":"Red Dingo Enamel Dog \u0026 Cat ID Tags Camouflage 3 Colours","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Dog \u0026amp; Cat ID Tags Camouflage 3 Colours\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\r\n\u003cp\u003eThe Control of Dogs Order 1992 mandates that any dog in a public place must wear a collar with the name and address (including postcode) of the owner engraved or written on it, or engraved on a tag. Your telephone number is optional (but advisable).\u003c\/p\u003e\u003cp\u003eIf purchasing for your cat, we advise the small size only.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eAvailable in 3 colours\u003c\/strong\u003e - choose from dropdown.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003cbr\u003e \u003cstrong\u003eMedium\u003c\/strong\u003e - 5 Lines - all 16 characters\u003cbr\u003e \u003cstrong\u003eLarge\u003c\/strong\u003e - 6 Lines - all 19 characters\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 3 sizes - small, medium \u0026amp; large\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Dark Blue \/ Small","offer_id":37825961296048,"sku":"1CBNS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Small","offer_id":37825961459888,"sku":"1CGGS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Small","offer_id":37825961590960,"sku":"1CPPKS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Blue \/ Medium","offer_id":37825961361584,"sku":"1CBNM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Medium","offer_id":37825961492656,"sku":"1CGGM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Medium","offer_id":37825961656496,"sku":"1CPPKM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Blue \/ Large","offer_id":37825961394352,"sku":"1CBNL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Large","offer_id":37825961558192,"sku":"1CGGL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Large","offer_id":37825961689264,"sku":"1CPPKL","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/k2cxsob0srb.jpg?v=1736180530"},{"product_id":"red-dingo-enamel-dog-cat-id-tags-rainbow","title":"Red Dingo Enamel Dog \u0026 Cat ID Tags Rainbow","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Dog \u0026amp; Cat ID Tags Rainbow\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\r\n\u003cp\u003eThe Control of Dogs Order 1992 mandates that any dog in a public place must wear a collar with the name and address (including postcode) of the owner engraved or written on it, or engraved on a tag. Your telephone number is optional (but advisable).\u003c\/p\u003e\u003cp\u003eIf purchasing for your cat, we advise the small size only.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003cbr\u003e \u003cstrong\u003eMedium\u003c\/strong\u003e - 5 Lines - all 16 characters\u003cbr\u003e \u003cstrong\u003eLarge\u003c\/strong\u003e - 6 Lines - all 19 characters\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 3 sizes - small, medium \u0026amp; large\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Small","offer_id":37825963098288,"sku":"1RAWS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Medium","offer_id":37825963131056,"sku":"1RAWM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Large","offer_id":37825963163824,"sku":"1RAWL","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/sxfeg444eys.jpg?v=1736180535"},{"product_id":"red-dingo-enamel-dog-cat-id-tags-penguin","title":"Red Dingo Enamel Dog \u0026 Cat ID Tags Penguin","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Dog \u0026amp; Cat ID Tags Penguin\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\r\n\u003cp\u003eThe Control of Dogs Order 1992 mandates that any dog in a public place must wear a collar with the name and address (including postcode) of the owner engraved or written on it, or engraved on a tag. Your telephone number is optional (but advisable).\u003c\/p\u003e\u003cp\u003eIf purchasing for your cat, we advise the small size only.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003cbr\u003e \u003cstrong\u003eMedium\u003c\/strong\u003e - 5 Lines - all 16 characters\u003cbr\u003e \u003cstrong\u003eLarge\u003c\/strong\u003e - 6 Lines - all 19 characters\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 3 sizes - small, medium \u0026amp; large\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Small","offer_id":37825963229360,"sku":"1PEWS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Medium","offer_id":37825963262128,"sku":"1PEWM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Large","offer_id":37825963294896,"sku":"1PEWL","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/ianzpv0jdti.jpg?v=1736180538"},{"product_id":"red-dingo-enamel-dog-id-tags-bone-11-colours","title":"Red Dingo Enamel Dog ID Tags Bone 11 Colours","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Dog ID Tags Bone 11 Colours\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\r\n\u003cp\u003eThe Control of Dogs Order 1992 mandates that any dog in a public place must wear a collar with the name and address (including postcode) of the owner engraved or written on it, or engraved on a tag. Your telephone number is optional (but advisable).\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eAvailable in 11 colours\u003c\/strong\u003e - choose from dropdown.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003cbr\u003e \u003cstrong\u003eMedium\u003c\/strong\u003e - 5 Lines - all 16 characters\u003cbr\u003e \u003cstrong\u003eLarge\u003c\/strong\u003e - 6 Lines - all 19 characters\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 3 sizes - small, medium \u0026amp; large\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Black \/ Small","offer_id":37825967030448,"sku":"1BNBS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Brown \/ Small","offer_id":37825967194288,"sku":"1BNBRS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Red \/ Small","offer_id":37825967325360,"sku":"1BNRS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Orange \/ Small","offer_id":37825967489200,"sku":"1BNOS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Yellow \/ Small","offer_id":37825967653040,"sku":"1BNYS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Small","offer_id":37825967816880,"sku":"1BNGS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Blue \/ Small","offer_id":37825967947952,"sku":"1BNNS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue \/ Small","offer_id":37825968046256,"sku":"1BNLBS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Small","offer_id":37825968144560,"sku":"1BNPS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Hot Pink \/ Small","offer_id":37825968242864,"sku":"1BNHPS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Small","offer_id":37825968341168,"sku":"1BNPKS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Black \/ Medium","offer_id":37825967063216,"sku":"1BNBM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Brown \/ Medium","offer_id":37825967227056,"sku":"1BNBRM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Red \/ Medium","offer_id":37825967390896,"sku":"1BNRM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Orange \/ Medium","offer_id":37825967521968,"sku":"1BNOM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Yellow \/ Medium","offer_id":37825967685808,"sku":"1BNYM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Medium","offer_id":37825967849648,"sku":"1BNGM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Blue \/ Medium","offer_id":37825967980720,"sku":"1BNNM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue \/ Medium","offer_id":37825968079024,"sku":"1BNLBM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Medium","offer_id":37825968177328,"sku":"1BNPM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Hot Pink \/ Medium","offer_id":37825968275632,"sku":"1BNHPM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Medium","offer_id":37825968373936,"sku":"1BNPKM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Black \/ Large","offer_id":37825967128752,"sku":"1BNBL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Brown \/ Large","offer_id":37825967292592,"sku":"1BNBRL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Red \/ Large","offer_id":37825967423664,"sku":"1BNRL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Orange \/ Large","offer_id":37825967587504,"sku":"1BNOL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Yellow \/ Large","offer_id":37825967751344,"sku":"1BNYL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green \/ Large","offer_id":37825967882416,"sku":"1BNGL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Blue \/ Large","offer_id":37825968013488,"sku":"1BNNL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue \/ Large","offer_id":37825968111792,"sku":"1BNLBL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Large","offer_id":37825968210096,"sku":"1BNPL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Hot Pink \/ Large","offer_id":37825968308400,"sku":"1BNHPL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Large","offer_id":37825968406704,"sku":"1BNPKL","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/kf4brpiniab.jpg?v=1736180549"},{"product_id":"red-dingo-enamel-cat-id-tags-fish-11-colours","title":"Red Dingo Enamel Cat ID Tags Fish 11 Colours","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Cat ID Tags Fish 11 Colours\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eAvailable in 11 colours\u003c\/strong\u003e - choose from dropdown.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003eYour telephone number is optional (but advisable).\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 11 fabulous colours!\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Brown","offer_id":37825971257520,"sku":"1FIBRS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Black","offer_id":37825971290288,"sku":"1FIBS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Dark Blue","offer_id":37825971323056,"sku":"1FINS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Red","offer_id":37825971355824,"sku":"1FIRS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Orange","offer_id":37825971388592,"sku":"1FIOS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Yellow","offer_id":37825971421360,"sku":"1FIYS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Green","offer_id":37825971454128,"sku":"1FIGS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue","offer_id":37825971486896,"sku":"1FILBS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple","offer_id":37825971519664,"sku":"1FIPS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Hot Pink","offer_id":37825971552432,"sku":"1FIHPS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink","offer_id":37825971585200,"sku":"1FIPKS","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/w4prvouqi2r.jpg?v=1736180564"},{"product_id":"red-dingo-enamel-dog-cat-id-tags-uk-flag","title":"Red Dingo Enamel Dog \u0026 Cat ID Tags UK Flag","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Dog \u0026amp; Cat ID Tags UK Flag\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\r\n\u003cp\u003eThe Control of Dogs Order 1992 mandates that any dog in a public place must wear a collar with the name and address (including postcode) of the owner engraved or written on it, or engraved on a tag. Your telephone number is optional (but advisable).\u003c\/p\u003e\u003cp\u003eIf purchasing for your cat, we advise the small size only.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003cbr\u003e \u003cstrong\u003eMedium\u003c\/strong\u003e - 5 Lines - all 16 characters\u003cbr\u003e \u003cstrong\u003eLarge\u003c\/strong\u003e - 6 Lines - all 19 characters\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 3 sizes - small, medium \u0026amp; large\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Small","offer_id":37825972371632,"sku":"XUCAS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Medium","offer_id":37825972404400,"sku":"XUCAM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Large","offer_id":37825972437168,"sku":"XUCAL","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/ahdawuijzfz.jpg?v=1736180569"},{"product_id":"red-dingo-enamel-dog-cat-id-tags-ying-yang","title":"Red Dingo Enamel Dog \u0026 Cat ID Tags Ying \u0026 Yang","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Dog \u0026amp; Cat ID Tags Ying \u0026amp; Yang\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\r\n\u003cp\u003eThe Control of Dogs Order 1992 mandates that any dog in a public place must wear a collar with the name and address (including postcode) of the owner engraved or written on it, or engraved on a tag. Your telephone number is optional (but advisable).\u003c\/p\u003e\u003cp\u003eIf purchasing for your cat, we advise the small size only.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003cbr\u003e \u003cstrong\u003eMedium\u003c\/strong\u003e - 5 Lines - all 16 characters\u003cbr\u003e \u003cstrong\u003eLarge\u003c\/strong\u003e - 6 Lines - all 19 characters\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 3 sizes - small, medium \u0026amp; large\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Small","offer_id":37825972469936,"sku":"1YYBS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Medium","offer_id":37825972502704,"sku":"1YYBM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Large","offer_id":37825972535472,"sku":"1YYBL","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/wtxgtzcveat.jpg?v=1736180572"},{"product_id":"red-dingo-enamel-dog-cat-id-tags-butterfly-3-colours","title":"Red Dingo Enamel Dog \u0026 Cat ID Tags Butterfly 3 Colours","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eRed Dingo Enamel Dog \u0026amp; Cat ID Tags Butterfly 3 Colours\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRed Dingo is an Australian company who have put together a wide variety of high quality pet tags. All the products are strength and safety tested to the highest quality standard in manufacturing terms and will not rust, break or corrode. We offer an engraving service at no extra cost which is guaranteed for the life of the tag.\u003c\/p\u003e\r\n\u003cp\u003eThe Control of Dogs Order 1992 mandates that any dog in a public place must wear a collar with the name and address (including postcode) of the owner engraved or written on it, or engraved on a tag. Your telephone number is optional (but advisable).\u003c\/p\u003e\u003cp\u003eIf purchasing for your cat, we advise the small size only.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eFree engraving on all ID tags!\u003c\/strong\u003e - you will be emailed after purchase for engraving requirements\u003cbr\u003e \u003cstrong\u003eSmall\u003c\/strong\u003e - Line 1 -10 characters \/ Line 2 - 12 characters \/ Line 3 - 10 characters\u003cbr\u003e \u003cstrong\u003eMedium\u003c\/strong\u003e - 5 Lines - all 16 characters\u003cbr\u003e \u003cstrong\u003eLarge\u003c\/strong\u003e - 6 Lines - all 19 characters\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Strength and safety tested to the highest standard\u003c\/li\u003e\n\u003cli\u003e Quality - will not rust, break or corrode\u003c\/li\u003e\n\u003cli\u003e Free engraving service - guaranteed for the life of the tag\u003c\/li\u003e\n\u003cli\u003e Available in 3 sizes - small, medium \u0026amp; large\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Red Dingo","offers":[{"title":"Light Blue \/ Small","offer_id":37825974763696,"sku":"1BLLBS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Small","offer_id":37825974862000,"sku":"1BUPS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Small","offer_id":37825974960304,"sku":"1BPPKS","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue \/ Medium","offer_id":37825974796464,"sku":"1BLLBM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Medium","offer_id":37825974894768,"sku":"1BUPM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Medium","offer_id":37825974993072,"sku":"1BPPKM","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Light Blue \/ Large","offer_id":37825974829232,"sku":"1BLLBL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Purple \/ Large","offer_id":37825974927536,"sku":"1BUPL","price":11.0,"currency_code":"GBP","in_stock":true},{"title":"Pink \/ Large","offer_id":37825975025840,"sku":"1BPPKL","price":11.0,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/xvzevihykzc.jpg?v=1736180577"},{"product_id":"cjs-cat-litter-wood-pellets-5l-15l-30l","title":"CJs Cat Litter Wood Pellets 5L \/ 15L \/ 30L","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eCJs Cat Litter Wood Pellets 5L \/ 15L \/ 30L\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eCJ’s Premium Cat Litter is 100% natural and made from virgin softwood. As it is antimicrobial, germs and bacterial cannot form on it, meaning that any odours are completely eradicated, not just masked with a scent. As the litter is ultra-absorbent, any liquid is soaked up. To keep the litter clean and fresh, remove anything your pet has left and shake the tray to bring fresh pellets to the surface. To dispose of the litter, add to your usual household waste or use for compost. The litter is 100% biodegradable! The soft pellets don’t stick to paws so you won’t have to clean up any tracking or find surprises elsewhere.\u003c\/p\u003e\r\n\u003cp\u003eCJ’s cat litter is 100% virgin wood and they plant another tree every time one is harvested.\u003c\/p\u003e\u003cp\u003eAvailable in 3 bag sizes - 5L, 15L \u0026amp; 30L\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 100% natural wood pellets from virgin softwood trees\u003c\/li\u003e\n\u003cli\u003e Natural pine scent\u003c\/li\u003e\n\u003cli\u003e Ultra-absorbent, biodegradable litter\u003c\/li\u003e\n\u003cli\u003e Soft and doesn’t stick to paws\u003c\/li\u003e\n\u003cli\u003e FSC approved\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"CJs","offers":[{"title":"5 litres","offer_id":37825976402096,"sku":"CJS-LITTER-5L","price":4.99,"currency_code":"GBP","in_stock":true},{"title":"15 litres","offer_id":37825976434864,"sku":"CJS-LITTER-15L","price":7.99,"currency_code":"GBP","in_stock":true},{"title":"30 litres","offer_id":37825976467632,"sku":"CJS-LITTER-30L","price":15.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/1nxjx4wiyrd.jpg?v=1734623601"},{"product_id":"beaphar-wormclear-for-small-dogs-up-to-20kg-worming-tablets-x-2","title":"Beaphar WORMclear for Small Dogs up to 20kg Worming Tablets x 2","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eBeaphar WORMclear for Small Dogs Worming Tablets\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eBeaphar WORMclear® for small dogs are pork flavoured tablets which kill roundworms and tapeworms. They can be used on dogs over the age of two weeks and weighing over 3kg and are effective in one simple dose. Puppies should be treated at 2 weeks of age and then every 14 days until 12 weeks old. Nursing bitches should be treated 2 weeks after birth and every two weeks until weaning. To remain worm free adult dogs should be treated every 3 months and any sources of re-infestation such as fleas or mice should be removed.\u003c\/p\u003e\r\n\u003cp\u003eEach pack contains 2 tablets, enough to treat a dog weighing up to 20kg. Please follow the dosage instructions on the packaging as dose will depend on the weight of your dog.\u003c\/p\u003e\r\n\u003cp\u003eBeaphar WORMclear for Small Dogs is an authorised veterinary medicines.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eHow to use:\u003c\/strong\u003e\u003cbr\u003e\r\nRead the enclosed leaflet before use. For oral administration, 1 tablet per 10 kg bodyweight. Tablets should be given directly to the dog or if necessary given with food. This medicine does not need to be given on an empty stomach. It is important to follow the treatment recommendations presented in the table.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eBodyweight\u003c\/strong\u003e\u003cbr\u003e\r\nGreater than 3kg up to 5kg - ½ tablet\u003cbr\u003e\r\nGreater than 5kg up to 10kg - 1 tablet\u003cbr\u003e\r\nGreater than 10kg to 15kg - 1½ tablets\u003cbr\u003e\r\nGreater than 15kg to 20kg - 2 tablets\u003c\/p\u003e","brand":"Beaphar","offers":[{"title":"Default Title","offer_id":37825985806512,"sku":"11793","price":4.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/files\/bvek1uk41j2.jpg?v=1768481706"},{"product_id":"beaphar-wormclear-for-large-dogs-up-to-40kg-worming-tablets-x-4","title":"Beaphar WORMclear for Large Dogs up to 40kg Worming Tablets x 4","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eBeaphar WORMclear for Large Dogs Worming Tablets\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eBeaphar WORMclear® for large dogs are pork flavoured tablets which kill roundworms and tapeworms. They can be used on dogs over the age of two weeks and weighing over 3kg and are effective in one simple dose. Puppies should be treated at 2 weeks of age and then every 14 days until 12 weeks old. Nursing bitches should be treated 2 weeks after birth and every two weeks until weaning. To remain worm free adult dogs should be treated every 3 months and any sources of re-infestation such as fleas or mice should be removed.\u003c\/p\u003e\r\n\u003cp\u003eEach pack contains 4 tablets, enough to treat a dog weighing up to 40kg. Please follow the dosage instructions on the packaging as correct dose will depend on the weight of your dog.\u003c\/p\u003e\r\n\u003cp\u003eBeaphar WORMclear for large dogs is an authorised veterinary medicine.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eHow to use:\u003c\/strong\u003e\u003cbr\u003e\r\nRead the enclosed leaflet before use. For oral administration, 1 tablet per 10 kg bodyweight. Tablets should be given directly to the dog or if necessary given with food. This medicine does not need to be given on an empty stomach. It is important to follow the treatment recommendations presented in the table.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eBodyweight\u003c\/strong\u003e\u003cbr\u003e\r\nGreater than 3kg up to 5kg - ½ tablet\u003cbr\u003e\r\nGreater than 5kg up to 10kg - 1 tablet\u003cbr\u003e\r\nGreater than 10kg to 15kg - 1½ tablets\u003cbr\u003e\r\nGreater than 15kg to 20kg - 2 tablets\u003cbr\u003e\r\nGreater than 20kg up to 25kg - 2½ tablets\u003cbr\u003e\r\nGreater than 25kg up to 30kg - 3 tablets\u003cbr\u003e\r\nGreater than 30kg up to 35kg - 3½ tablets\u003cbr\u003e\r\nGreater than 35kg up to 40kg - 4 tablets\u003c\/p\u003e","brand":"Beaphar","offers":[{"title":"Default Title","offer_id":37825986592944,"sku":"11795","price":6.5,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/files\/fifnkouyu0r.jpg?v=1768481877"},{"product_id":"beaphar-wormclear-for-cats-worming-tablets-x-2","title":"Beaphar WORMclear for Cats Worming Tablets x 2","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eBeaphar WORMclear for Cats Worming Tablets\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eBeaphar WORMclear® for cats kills roundworms and tapeworms. It can be used on cats and kittens from 6 weeks of age and is effective in one simple dose. Kittens should be treated every 14 days until 2-3 weeks after weaning. To remain worm free adult cats should be treated every 3 months and any sources of re-infestation such as fleas or mice should be removed.\u003c\/p\u003e\r\n\u003cp\u003eBeaphar WORMclear for cats is an authorised veterinary product.\u003cbr\u003e\r\n\u003cbr\u003e\r\n\u003cstrong\u003eHow to use:\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eRead the enclosed leaflet before use. To ensure administration of a correct dose, bodyweight should be determined as accurately as possible.For oral administration only. The tablet should be given directly to the cat, but if necessary can be disguised in food. Weigh the cat carefully and use this table for the correct dose rate. 1 tablet per 4kg body weight.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eBodyweight\u003c\/strong\u003e\u003cbr\u003e\r\nGreater than 1.0kg up to 2kg - ½ tablet\u003cbr\u003e\r\nGreater than 2kg up to 4kg - 1 tablet\u003cbr\u003e\r\nGreater than 4kg up to 6kg - 1½ tablets\u003cbr\u003e\r\nGreater than 6kg - 2 tablets\u003c\/p\u003e","brand":"Beaphar","offers":[{"title":"Default Title","offer_id":37825986625712,"sku":"11790","price":5.75,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/files\/tkx3r4pslqx.jpg?v=1768482112"},{"product_id":"ancol-cat-collar-bells-pack-of-9","title":"Ancol Cat Collar Bells - Pack of 9","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Cat Collar Bells - Pack of 9\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eThese handy cat collar warning bells give a little jingle to warn off wildlife when your cat is hunting.\u003cbr\u003e The RSPB state that a cat with a collar bell will catch 41% fewer birds and 34% fewer mammals.\u003c\/p\u003e\r\n\u003cp\u003eEach pack includes 9 bells\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Easy to fit to any cat collar\u003c\/li\u003e\n\u003cli\u003e Will fit cat \u0026amp; kitten collars\u003c\/li\u003e\n\u003cli\u003e Warns wildlife when your cat is hunting\u003c\/li\u003e\n\u003cli\u003e Pack of 9 bells\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Ancol","offers":[{"title":"Default Title","offer_id":37825987281072,"sku":"331100X3","price":2.95,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/ig4bpiqga0p.jpg?v=1734622733"},{"product_id":"ancol-cat-small-dog-bed-plush-pyramid-grey","title":"Ancol Cat \u0026 Small Dog Bed Plush Pyramid Grey","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Cat \u0026amp; Small Dog Bed Plush Pyramid Grey\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eThe Plush Cat \u0026amp; Small Dog Pyramid is a private and cosy bed for relaxed naps. With thick sides and an over-stuffed base cushion, the bed insulates your pet for cosy naps. The fleece lined cushion can be removed for washing.\u003cbr\u003e\u003cbr\u003eThis bed features a stylish print and non-slip base. \u003cbr\u003e\u003cbr\u003eThis bed measures 40cm x 40cm x 43cm and is perfect for cats and small dogs.\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Soft, fleecy sides for added warmth \u0026amp; comfort\u003c\/li\u003e\n\u003cli\u003e Hugs your pet from all directions for relaxed naps\u003c\/li\u003e\n\u003cli\u003e Stylish geometric print and a non-slip base\u003c\/li\u003e\n\u003cli\u003e Pyramid bed measures 40cm x 40cm x 43cm\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Ancol","offers":[{"title":"Default Title","offer_id":37825993310384,"sku":"554700","price":18.45,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/files\/bgkysh3ogvo.jpg?v=1734622728"},{"product_id":"ancol-dog-safety-harness-car-isofix-attachment","title":"Ancol Dog Safety Harness Car ISOFIX Attachment","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Dog Safety Harness Car ISOFIX Attachment\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eThe Ancol Car ISOFIX attachment is perfect for attaching your dogs harness to the ISOFIX connection points in your car (please check that your car has ISOFIX safety connection points).\u003cbr\u003e ISOFIX is the international standard for attachment points for child safety seats in passenger cars and allows this safety product to attach securely and keep your pet safe.\u003c\/p\u003e\r\n\u003cp\u003eUsing products such as these ensure you follow 'Highway Code - Rule 57'...\u003cbr\u003e \"When in a vehicle make sure dogs or other animals are suitably restrained so they cannot distract you while you are driving or injure you or themselves if you stop quickly. A seat belt harness, pet carrier, dog cage, or dog guard are ways of restraining animals in cars\"\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Attaches your dog harness to your cars ISOFIX\u003c\/li\u003e\n\u003cli\u003e Check that your car has ISOFIX connection points\u003c\/li\u003e\n\u003cli\u003e Restrain your dog to avoid distractions whilst driving\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Ancol","offers":[{"title":"Default Title","offer_id":37825993506992,"sku":"741600","price":10.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/tkkmv4sxz33.jpg?v=1734622848"},{"product_id":"ancol-ergo-cat-grooming-moulting-comb","title":"Ancol Ergo Cat Grooming Moulting Comb","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Ergo Cat Grooming Moulting Comb\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eThe Ancol Ergo Moulting Comb has two lengths of teeth to help remove loose hair from the undercoat and top coat, particularly useful when your cat is shedding. The medical quality stainless steel pins are rounded at the ends to prevent discomfort and be gentle on your cat's skin. Grooming a cat helps maintain a smooth and glossy coat and can be a lovely way of bonding with your pet. Regular grooming to remove loose hair, particularly when your cat is moulting, will lessen the amount of fur they ingest when grooming themselves which will reduce fur balls and associated problems. Regular grooming will also reduce the amount of shed fur around the home. \u003c\/p\u003e\u003cp\u003eSize 10cm x 25cm\u003c\/p\u003e","brand":"Ancol","offers":[{"title":"Default Title","offer_id":37825995571376,"sku":"401200","price":3.25,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/ttsoi52nmbw.jpg?v=1734622858"},{"product_id":"ancol-ergo-cat-grooming-double-sided-comb","title":"Ancol Ergo Cat Grooming Double Sided Comb","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Ergo Cat Grooming Double Sided Comb\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eThe Ancol Ergo Double Sided Comb is a pragmatic tool to detangle and smooth your cat's coat. One side of the comb has wide teeth, to gently detangle coarse and long haired coats. The other side has finer teeth to smooth and neaten fur and remove loose hairs, suitable for short hair coats or longer coats that have been detangled. The medical quality stainless steel pins are rounded at the ends to prevent discomfort and be gentle on your cat's skin. Grooming a cat helps maintain a smooth and glossy coat and can be a lovely way of bonding with your pet. Regular grooming to remove loose hair, particularly when your cat is moulting, will lessen the amount of fur they ingest when grooming themselves which will reduce fur balls and associated problems. Regular grooming will also reduce the amount of shed fur around the home. \u003c\/p\u003e\u003cp\u003eSize 11cm x 26cm\u003c\/p\u003e","brand":"Ancol","offers":[{"title":"Default Title","offer_id":37825995702448,"sku":"405300","price":4.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/hlmxeiupp3a.jpg?v=1734622851"},{"product_id":"catit-design-senses-cat-catnip-spray-90ml","title":"Catit Design Senses Cat Catnip Spray 90ml","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eCatit Design Senses Cat Catnip Spray 90ml \u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eCatit Design Senses Catnip spray, a concentrated extract of pure catnip, provides your cat with maxiumum fun and excitement. Spray on toys, scratching posts, and other play areas to attract and entice your cat. \u003c\/p\u003e\u003cp\u003eSize 90ml\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e A concentrated extract of pure catnip\u003c\/li\u003e\n\u003cli\u003e Provides your cat with maximum fun and excitement\u003c\/li\u003e\n\u003cli\u003e Spray on cat toys, scratching posts or home-made soft toys\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Catit","offers":[{"title":"Default Title","offer_id":37826000715952,"sku":"50753*","price":4.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/sdpl0xyp525.jpg?v=1734623414"},{"product_id":"habitrail-ovo-hood-side-insert-replacement-part","title":"Habitrail OVO Hood Side Insert Replacement Part","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eHabitrail OVO Hood Side Insert Replacement Part\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eFits \u003cbr\u003e\u003c\/strong\u003e\u003ca href=\"https:\/\/www.realpetstore.co.uk\/habitrail-ovo-dwarf-hamster-mice-cage-habitat.html\" target=\"_blank\"\u003eHabitrail OVO Dwarf Hamster \u0026amp; Mice Cage Habitat\u003c\/a\u003e\u003cbr\u003e\u003ca href=\"https:\/\/www.realpetstore.co.uk\/habitrail-ovo-suite-hamster-cage-habitat.html\" target=\"_blank\"\u003eHabitrail OVO Suite Hamster Cage Habitat\u003c\/a\u003e\u003cbr\u003e\u003ca href=\"https:\/\/www.realpetstore.co.uk\/habitrail-ovo-home-pink-hamster-cage-habitat.html\" target=\"_blank\"\u003eHabitrail OVO Home Pink Hamster Cage Habitat\u003c\/a\u003e\u003cbr\u003e\u003ca href=\"https:\/\/www.realpetstore.co.uk\/habitrail-ovo-home-blue-hamster-cage-habitat.html\" target=\"_blank\"\u003eHabitrail OVO Home Blue Hamster Cage Habitat\u003c\/a\u003e\u003cbr\u003e\u003ca href=\"https:\/\/www.realpetstore.co.uk\/habitrail-ovo-pink-maze-habitat-add-on.html\" target=\"_blank\"\u003eHabitrail OVO Pink Maze Habitat Add-On\u003c\/a\u003e\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Habitrail replacement parts\u003c\/li\u003e\n\u003cli\u003e Replacement hood side insert part\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Habitrail","offers":[{"title":"Default Title","offer_id":37826001830064,"sku":"62922","price":0.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/ntkafztvbuh.jpg?v=1702918281"},{"product_id":"simple-solution-cat-litter-odour-eliminator-500ml","title":"Simple Solution Cat Litter Odour Eliminator 500ml","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eSimple Solution Cat Litter Odour Eliminator 500ml\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eMore than just an ordinary deodoriser, Simple Solution completely eliminates all organic stains and odours. We're talking urine, vomit, faeces, blood, dirt, grass, red wine, juice, coffee, tea, baby formula... and more. Matter of fact, Simple Solution works the first time, every time, guaranteed! That's because Simple Solution combines advanced cleansers with beneficial bacteria and enzymes. This combination provides a powerful punch yet is safe to use on carpets, upholstery, pet bedding, clothing, tile, concrete, brick and any other water-safe surface. Better yet, all the ingredients in Simple Solution are non-toxic and are harmless to pets and people.\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Clump-free formula for daily use\u003c\/li\u003e\n\u003cli\u003e Great as a litter box cleaner - breaks down stubborn, stuck-on urine and faeces\u003c\/li\u003e\n\u003cli\u003e Completely eliminates odours to ensure litter box acceptance\u003c\/li\u003e\n\u003cli\u003e Leaves house smelling fresh and clean all day long\u003c\/li\u003e\n\u003cli\u003e Safe for use around pets and children when used as directed\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Simple Solution","offers":[{"title":"Default Title","offer_id":37826004254896,"sku":"SS-LITTER-DEODORISER","price":7.49,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/fnu4ydzd3wb.jpg?v=1734623803"},{"product_id":"animal-instincts-cat-litter-tray-liner-universal-55x40cm-pack-of-6","title":"Animal Instincts Cat Litter Tray Liner Universal 55x40cm Pack of 6","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAnimal Instincts Cat Litter Tray Liner Universal 55x40cm Pack of 6\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eCat litter tray liners from Animal Instincts, the hygenic way to dispose of cat litter - easy to use \u0026amp; rip \/ leak resistant.\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Hygenic way to dispose of cat litter\u003c\/li\u003e\n\u003cli\u003e Easy to use \u0026amp; rip \/ leak resistant\u003c\/li\u003e\n\u003cli\u003e Fits trays up to 55 x 40cm\u003c\/li\u003e\n\u003cli\u003e Pack of 6 liners\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Animal Instincts","offers":[{"title":"Default Title","offer_id":37826004549808,"sku":"AI-LINERS","price":3.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/04lwelnua31.jpg?v=1734623146"},{"product_id":"mini-encyclopedia-of-dog-training-behaviour","title":"Mini Encyclopedia of Dog Training \u0026 Behaviour","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eMini Encyclopedia of Dog Training \u0026amp; Behaviour\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eFew people would deny that a badly behaved dog is a complete pest. The key to training a dog to respond obediently to commands is to use an understanding of canine psychology to reward the behaviour that you want to encourage. It may sound complicated, but this Mini Encyclopedia provides instant instruction that makes everything clear. Annotated photographic sequences combine with expert text to teach the essential obedience lessons that will ensure that your dog is a pet to be proud of.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 09943 \u003cbr\u003eISBN: 9781842861141 \u003cbr\u003eAuthor: Tennant, Colin \u003cbr\u003ePages: 208 Cover \u003cbr\u003eType: Paperback \u003cbr\u003eSize: 18.4cm x 15.6cm 1.8cm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826004582576,"sku":"9943","price":9.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/4wztmpbjl5q.jpg?v=1702918552"},{"product_id":"breaking-bad-habits-in-dogs-revised-edition","title":"Breaking Bad Habits In Dogs (Revised edition)","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eBreaking Bad Habits In Dogs (Revised edition)\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eFirst published in 2002, this book has been a true best seller. It was been translated into many languages and proved incredibly popular with dog lovers across the globe who appreciate its blend of good advice, sensible attitude to solving canine problems and innovative graphic style. It is now republished in a revised and updated edition that has been overseen by its author, the internationally respected authority Colin Tennant, who is the Principal of the Cambridge Institute of Dog Behavior \u0026amp; Training. The text has bee updated where necessary while the entire book has been redesigned in a new graphic style and approximately 50 new photographs have been added. This modern look gives a bright new identity to a trusted reference work that remains unrivalled for the range and effectiveness of its methods.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 20271 \u003cbr\u003eISBN: 9781842862285 \u003cbr\u003eAuthor: Colin Tennant \u003cbr\u003ePages: 208 \u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 25cm x 21.4cm x 2cm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826005303472,"sku":"20271","price":10.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/c35ws1uckqd.jpg?v=1702917667"},{"product_id":"what-if-my-dog","title":"What If My Dog...?","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eWhat If My Dog...?\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eWhat If My Dog is a book that tells you all those vital things that so many other dog books miss out. It concentrates on the possible pitfalls and problems that an owner may confront in the course of day-to-day life with a dog and offers sound practical advice on coping with behavioural and training problems, mishaps and anti-social actions around the home. Packed also with invaluable guidance on how to react if your dog shows signs of illness or is hurt, this handbook promises a stress-free life for both dog and owner.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 09935 \u003cbr\u003eISBN: 9781842861165 \u003cbr\u003eAuthor: Evans, Jim \u003cbr\u003ePages: 160 \u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 22cm x 16.5cm x 1.2cm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826005434544,"sku":"9935","price":9.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/ta1czefu2gc.jpg?v=1702919644"},{"product_id":"doggy-problems-solved","title":"Doggy Problems Solved by Amanda O'Neill book","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eDoggy Problems Solved\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eDogs are unique in the way that they participate on our domestic lives. Like children, they share our homes, meet our friends, come with us on holiday, travel with us in the care, play games with us etc, etc. But, also like children, they sometimes have an uncanny knack of embarrasing us in public and creating all sorts of mayhem in private. Whether it's thrusting its nose unerringly towards your maiden aunt's nether regions or using the Persian rug as an impromptu toilet, you know that when a dog steps off the straight and narrow, there will be some explaining or clearing up to do. However, for anyone who's experienced similar embarrassments or annoyances, help is now at hand! Amanda O'Neill analyses what lies behind a multitude of such anti-social behaviours and comes up with a host of sensible suggestions for remedies.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 20240 \u003cbr\u003eISBN: 9781842862179 \u003cbr\u003eAuthor: Amanda O'Neill \u003cbr\u003ePages: 160 \u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 21.6cm x 16.4cm x 2cm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826005467312,"sku":"20240","price":0.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/xaqrtzjkfro.jpg?v=1702918175"},{"product_id":"what-dog-revised-edition","title":"What Dog? (Revised Edition) by Amanda O'Neill book","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eWhat Dog? (Revised Edition)\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eWhat Dog? Is precisely that – a guide to the hundred most popular breeds of dog that highlights their individual characters and which provides welcome advice on how well they fit into a home, how much exercise they need, how much grooming, how amenable they are to training, etc. etc. Each breed is beautifully illustrated, both adult dogs and puppies being pictured, while a colour bar-chart provides at-a-glance visual reference about seven of the most important character traits. This newly revised edition features a new and exciting group of Designer Dogs.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 20333 \u003cbr\u003eISBN: 9781842862513 \u003cbr\u003eAuthor: Amanda O'Neill \u003cbr\u003ePages: 224 \u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 15.7 x 1.5 x 18.5 cm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826005729456,"sku":"20333","price":0.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/qa3hwe4c2mk.jpg?v=1702919642"},{"product_id":"ultimate-dog-grooming-2nd-edition","title":"Ultimate Dog Grooming (2nd Edition)","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eUltimate Dog Grooming (2nd Edition)\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eThis encyclopaedic book uncovers all the mysteries of dog grooming. The first part is dedicated to routine caring for the pet dog in the home, while part two is devoted to professional grooming. There are chapters on starting out in business, disorders, and handling common problems, such as ‘difficult’ dogs. The final part covers the individual breeds. Each chapter is dedicated to a coat type, and step-by-step instructions are given on how to groom each breed from start to finish. More than 500 top-class colour photographs and line drawings complement the all important advice.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 20334 \u003cbr\u003eISBN: 9781842862438 \u003cbr\u003eAuthor: Eileen Geeson \u003cbr\u003ePages: 304 \u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 279mm x 201mm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826006319280,"sku":"20334","price":25.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/yjhtlygqk13.jpg?v=1702919640"},{"product_id":"dont-shoot-the-dog","title":"Don't Shoot The Dog","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eDon't Shoot The Dog\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eKaren Pryor’s clear and entertaining explanation of behavioural training methods made Don’t Shoot the Dog! A bestselling classic. This revised edition presents more of her insights into animal – and human – behaviour.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 09873 \u003cbr\u003eISBN: 9781860542381 \u003cbr\u003eAuthor: Karen Pryor \u003cbr\u003ePages: 204 \u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 19.7cm x 13cm 1.5cm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826006581424,"sku":"9873","price":5.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/yfrzv1jtzvb.jpg?v=1702918197"},{"product_id":"brain-games-for-cats","title":"Brain Games For Cats by Claire Arrowsmith book","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eBrain Games For Cats\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eThe innovative new title aims to show owners of cats how a routine of simple but enriching brain games can make your pet a happier, healthier and more loving companion for life. Brain Games For Cats is a brilliantly conceived compendium of fun games, tricks and activities that you can enjoy with your cat or kitten that will keep them fit and stimulated from an early age\u003c\/p\u003e\r\n\u003cp\u003eGames for all cat types:\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Games for more active cats\u003c\/li\u003e\n\u003cli\u003e Games for less active cats\u003c\/li\u003e\n\u003cli\u003e Games for creative owners\u003c\/li\u003e\n\u003cli\u003e Games for the garden or cat enclosure\u003c\/li\u003e\n\u003cli\u003e Games for extrovert cats\r\n\u003cp\u003eProduct Code: 20340 \u003cbr\u003eISBN: 9781842862568 \u003cbr\u003eAuthor: Claire Arrowsmith \u003cbr\u003ePages: 96 \u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 220mm x 165mm\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826007793840,"sku":"20340","price":0.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/os4c0mz4b2u.jpg?v=1702917663"},{"product_id":"cat-training-in-10-minutes","title":"Cat Training In 10 Minutes by Miriam Fields-Babineau book","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eCat Training In 10 Minutes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eDon't think your cat can learn to come on command, perch on your shoulder, or walk on a leash? Think again! Cat Training in 10 Minutes shows you how to teach your cat to perform simple tricks in just minutes a day. Author Miriam Fields-Babineau has first-hand, professional experience in training cats for television and film. Cat Training in 10 Minutes explains each trick in detail. Step-by-Step photos let you follow along and show you how to train your cat in your home. Cat Training in 10 Minutes not only provides the how-to of trick training, but also includes interviews with professional cat trainers working in the entertainment industry. Cat Training in 10 Minutes will help you to: keep your cat from becoming bored, spend more quality time with your feline, learn more about your cat's personality and show off your cat's newfound abilities to friends and family.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 2005303 \u003cbr\u003eISBN: 9780793805303 \u003cbr\u003eAuthor: Fields-Babineau, Miriam \u003cbr\u003ePages: 142\u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 22.3cm x 15.5cm x 1cm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826009333936,"sku":"2005303","price":0.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/aipglidfzk0.jpg?v=1702917712"},{"product_id":"cats-pet-friendly-understanding-and-caring-for-your-pet","title":"Cats - Pet Friendly: Understanding and Caring for Your Pet","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eCats - Pet Friendly: Understanding and Caring for Your Pet\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eThe more you know about your pet, the better you'll be able to provide the care and attention your pet requires for a healthy and happy life. The Pet Friendly guide offers expert advice on every aspect of pet care.\u003c\/p\u003e\r\n\u003cp\u003eProduct Code: 307116 \u003cbr\u003eISBN: 9781907337116 \u003cbr\u003eAuthor: Claire Horton-Bussey \u003cbr\u003ePages: 128 \u003cbr\u003eCover Type: Paperback \u003cbr\u003eSize: 16.4cm x 14cm x 1cm\u003c\/p\u003e","brand":"Books","offers":[{"title":"Default Title","offer_id":37826009694384,"sku":"307116","price":0.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/dcw3lkv1kk0.jpg?v=1702917833"},{"product_id":"lazy-bones-open-top-antique-parrot-bird-cage-with-stand","title":"Lazy Bones Open Top Antique Parrot Bird Cage with Stand","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eLazy Bones Open Top Antique Parrot Bird Cage with Stand\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eLazy Bones open top parrot cage in antique black with marble white base, including stand with castor wheels.\u003c\/p\u003e\u003cp\u003eDesign includes an open top to give your bird with wooden bar allowing your bird to venture out of its cage vertically.\u003cbr\u003eSlide out tray for easy cleaning and includes a grill to keep your birds feet off of their own mess - also includes under storage rack for food \u0026amp; other supplies.\u003c\/p\u003e\u003cp\u003eMedium sized parrot cage suitable for birds including senegals, conures, cockatiels \u0026amp; other similar birds.\u003c\/p\u003e\u003cp\u003eIncludes 2 wooden perches, 3 cups, stand, bottom basket, wheels, \u0026amp; pull out tray. \u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eDimensions (approx.)\u003c\/strong\u003e\u003cbr\u003eOverall size: 57 x 44 x 147cm (L x W x H)\u003cbr\u003eCage height without stand: 84cm\u003cbr\u003eBar spacing: 1.2cm - 1.5cm\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Antique black medium sized parrot cage\u003c\/li\u003e\n\u003cli\u003e Includes open top with perch\u003c\/li\u003e\n\u003cli\u003e Stand with castor wheels for easy positioning\u003c\/li\u003e\n\u003cli\u003e Slide out tray with grill for easy cleaning\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Lazy Bones","offers":[{"title":"Default Title","offer_id":37826021654704,"sku":"LB-B10","price":219.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/xunzkbf5gld.jpg?v=1702918455"},{"product_id":"orbiloc-dog-dual-safety-light-velcro-rubber-straps-accessories","title":"Orbiloc Dog Dual Safety Light Velcro \u0026 Rubber Straps Accessories","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eOrbiloc Dog Dual Safety Light Velcro \u0026amp; Rubber Straps Accessories\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eThe Orbiloc Strap Kit contains the Orbiloc Rubber Strap and the Orbiloc Velcro and is designed to be used with the Orbiloc Buckle.\u003c\/p\u003e\r\n\u003cp\u003eBoth Orbiloc Straps attach the Orbiloc Safety Light to any any pole, belt, strap, collar, leash as well as a variety of other objects.\u003c\/p\u003e\r\n\u003cp\u003e\u003cstrong\u003eIncludes...\u003c\/strong\u003e\u003cbr\u003eOrbiloc Rubber Strap\u003cbr\u003eOrbiloc Velcro Strap\u003c\/p\u003e","brand":"Orbiloc","offers":[{"title":"Default Title","offer_id":37826029224112,"sku":"ORBI-STRAPS","price":3.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/0ppksnungib.jpg?v=1734623783"},{"product_id":"classic-solid-rubber-ball-dog-toy-50mm-small","title":"Classic Solid Rubber Ball Dog Toy 50mm Small","description":"\u003cp class=\"largetext\"\u003eClassic Solid Rubber Ball Dog Toy 50mm Small\u003c\/p\u003e\r\n\u003cp\u003eFrom Classic's range of Tough Rubber Dog Toys, this small fun Solid Rubber Ball is bright and colourful, yet strong and tough to stand up to lots of rough and tumble play. Strong, solid rubber ball suitable for smaller dogs; this toy is great for games of throw and fetch and carry.\u003c\/p\u003e\r\n\u003cp\u003eDog toys should be replaced when damaged and worn. Supervised play is recommended. Supplied in one of 4 random colours - Purple, Blue, Red and Yellow.\u003c\/p\u003e\r\n\u003cp\u003eDiameter - 50mm\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e From Classic's range of favourite rubber toys\u003c\/li\u003e\n\u003cli\u003e Solid rubber small ball\u003c\/li\u003e\n\u003cli\u003e Best selling classic rubber ball\u003c\/li\u003e\n\u003cli\u003e Suitable for smaller dogs\u003c\/li\u003e\n\u003cli\u003e Great for interactive play\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"CLASSIC","offers":[{"title":"Default Title","offer_id":37826030207152,"sku":"CLASSIC-BALL-S","price":3.49,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/xdmijb1zgjk.jpg?v=1734623606"},{"product_id":"classic-solid-rubber-ball-dog-toy-60mm-medium","title":"Classic Solid Rubber Ball Dog Toy 60mm Medium","description":"\u003cp class=\"largetext\"\u003eClassic Solid Rubber Ball Dog Toy 60mm Medium\u003c\/p\u003e\r\n\u003cp\u003eFrom Classic's range of Tough Rubber Dog Toys, this medium fun Solid Rubber Ball is bright and colourful, yet strong and tough to stand up to lots of rough and tumble play. Strong, solid rubber ball suitable for medium sized puppies and adult dogs; this toy is great for games of throw and fetch and carry.\u003c\/p\u003e\r\n\u003cp\u003eDog toys should be replaced when damaged and worn. Supervised play is recommended. Supplied in one of 4 random colours - Purple, Blue, Red and Yellow.\u003c\/p\u003e\r\n\u003cp\u003eDiameter - 60mm...\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e From Classic's range of favourite rubber toys\u003cbr\u003e\r\n\u003c\/li\u003e\n\u003cli\u003e Solid rubber small ball\u003cbr\u003e\r\n\u003c\/li\u003e\n\u003cli\u003e Best selling classic rubber ball\u003cbr\u003e\r\n\u003c\/li\u003e\n\u003cli\u003e Suitable for smaller dogs\u003cbr\u003e\r\n\u003c\/li\u003e\n\u003cli\u003e Great for interactive play\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"CLASSIC","offers":[{"title":"Default Title","offer_id":37826030239920,"sku":"CLASSIC-BALL-M","price":5.49,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/zjkuql4bcbm.jpg?v=1734623609"},{"product_id":"classic-solid-rubber-ball-dog-toy-70mm-large","title":"Classic Solid Rubber Ball Dog Toy 70mm Large","description":"\u003cp class=\"largetext\"\u003eClassic Solid Rubber Ball Dog Toy 70mm Large\u003c\/p\u003e\r\n\u003cp\u003eFrom Classic's range of Tough Rubber Dog Toys, this large fun Solid Rubber Ball is bright and colourful, yet strong and tough to stand up to lots of rough and tumble play. Strong, solid rubber ball suitable for medium sized puppies and adult dogs; this toy is great for games of throw and fetch and carry.\u003c\/p\u003e\r\n\u003cp\u003eDog toys should be replaced when damaged and worn. Supervised play is recommended. Supplied in one of 4 random colours - Purple, Blue, Red and Yellow.\u003c\/p\u003e\r\n\u003cp\u003eDiameter - 60mm\u003c\/p\u003e\r\n\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e Large solid rubber ball 70mm\u003c\/li\u003e\n\u003cli\u003e Made from durable solid rubber\u003c\/li\u003e\n\u003cli\u003e Assorted primary colours\u003c\/li\u003e\n\u003cli\u003e Throw and fetch interactive play\u003c\/li\u003e\n\u003cli\u003e Suitable for medium to large dogs\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"CLASSIC","offers":[{"title":"Default Title","offer_id":37826030796976,"sku":"CLASSIC-BALL-L","price":6.49,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/oab5idpea5d.jpg?v=1734623611"},{"product_id":"truelove-dog-puppy-collars-airmesh-reflective-black-8-sizes","title":"Truelove Dog Puppy Collars Airmesh Reflective Black 8 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eTruelove Dog Puppy Collars Airmesh Reflective Black 8 Sizes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eTruelove durable dog collars feature soft, breathable air mesh fabric that is more comfortable for your dog to wear than a standard collar and is available in eight sizes and eleven different colours.\u003c\/p\u003e\u003cp\u003eThe unique design of these collars incorporates 3M scotchlite reflective strips for increased night time visibility and dog safety. All collars include an ultra light zinc-alloy D ring for leash attachment reducing the weight placed on your pets neck. Inside each collar is an information tag for writing your phone number on, in case your pet gets lost during a walk.\u003c\/p\u003e\u003cp\u003eSimple yet practical, the Truelove collars duraflex buckles are lightweight, easily adjustable and have a large loading capacity which improves the overall strength and durability of the collar.\u003c\/p\u003e\u003cp\u003eLove your dog!\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 11 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Made with breathable airmesh and nylon hemming\u003c\/li\u003e\n\u003cli\u003e 3M reflective strips for better pet visibility \u0026amp; safety\u003c\/li\u003e\n\u003cli\u003e Ultra light zinc-alloy D ring for leash attachment\u003c\/li\u003e\n\u003cli\u003e Adjustable and comfortable to wear\u003c\/li\u003e\n\u003cli\u003e Extremely forgiving around the neck\u003c\/li\u003e\n\u003cli\u003e Eight sizes to fit any dog: XXS, XS, S, M, L, XL, XXL, XXXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Truelove","offers":[{"title":"XX-Small","offer_id":37826088698032,"sku":"TLC5011-BLACK-XXS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Small","offer_id":37826088730800,"sku":"TLC5011-BLACK-XS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Small","offer_id":37826088763568,"sku":"TLC5011-BLACK-S","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Medium","offer_id":37826088796336,"sku":"TLC5011-BLACK-M","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Large","offer_id":37826088829104,"sku":"TLC5011-BLACK-L","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XX-Large","offer_id":37826088894640,"sku":"TLC5011-BLACK-XXL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XXX-Large","offer_id":37826088927408,"sku":"TLC5011-BLACK-XXXL","price":1.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/hgogew1gqd4.jpg?v=1702919498"},{"product_id":"truelove-dog-puppy-collars-airmesh-reflective-neon-yellow-8-sizes","title":"Truelove Dog Puppy Collars Airmesh Reflective Neon Yellow 8 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eTruelove Dog Puppy Collars Airmesh Reflective Neon Yellow 8 Sizes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eTruelove durable dog collars feature soft, breathable air mesh fabric that is more comfortable for your dog to wear than a standard collar and is available in eight sizes and eleven different colours.\u003c\/p\u003e\u003cp\u003eThe unique design of these collars incorporates 3M scotchlite reflective strips for increased night time visibility and dog safety. All collars include an ultra light zinc-alloy D ring for leash attachment reducing the weight placed on your pets neck. Inside each collar is an information tag for writing your phone number on, in case your pet gets lost during a walk.\u003c\/p\u003e\u003cp\u003eSimple yet practical, the Truelove collars duraflex buckles are lightweight, easily adjustable and have a large loading capacity which improves the overall strength and durability of the collar.\u003c\/p\u003e\u003cp\u003eLove your dog!\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 11 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Made with breathable airmesh and nylon hemming\u003c\/li\u003e\n\u003cli\u003e 3M reflective strips for better pet visibility \u0026amp; safety\u003c\/li\u003e\n\u003cli\u003e Ultra light zinc-alloy D ring for leash attachment\u003c\/li\u003e\n\u003cli\u003e Adjustable and comfortable to wear\u003c\/li\u003e\n\u003cli\u003e Extremely forgiving around the neck\u003c\/li\u003e\n\u003cli\u003e Eight sizes to fit any dog: XXS, XS, S, M, L, XL, XXL, XXXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Truelove","offers":[{"title":"XX-Small","offer_id":37826090008752,"sku":"TLC5011-NEONYELLOW-XXS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Small","offer_id":37826090041520,"sku":"TLC5011-NEONYELLOW-XS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Small","offer_id":37826090074288,"sku":"TLC5011-NEONYELLOW-S","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Medium","offer_id":37826090107056,"sku":"TLC5011-NEONYELLOW-M","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Large","offer_id":37826090139824,"sku":"TLC5011-NEONYELLOW-L","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Large","offer_id":37826090172592,"sku":"TLC5011-NEONYELLOW-XL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XX-Large","offer_id":37826090205360,"sku":"TLC5011-NEONYELLOW-XXL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XXX-Large","offer_id":37826090238128,"sku":"TLC5011-NEONYELLOW-XXXL","price":1.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/mzjzclad4z1.jpg?v=1702919534"},{"product_id":"truelove-dog-puppy-collars-airmesh-reflective-blue-8-sizes","title":"Truelove Dog Puppy Collars Airmesh Reflective Blue 8 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eTruelove Dog Puppy Collars Airmesh Reflective Blue 8 Sizes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eTruelove durable dog collars feature soft, breathable air mesh fabric that is more comfortable for your dog to wear than a standard collar and is available in eight sizes and eleven different colours.\u003c\/p\u003e\u003cp\u003eThe unique design of these collars incorporates 3M scotchlite reflective strips for increased night time visibility and dog safety. All collars include an ultra light zinc-alloy D ring for leash attachment reducing the weight placed on your pets neck. Inside each collar is an information tag for writing your phone number on, in case your pet gets lost during a walk.\u003c\/p\u003e\u003cp\u003eSimple yet practical, the Truelove collars duraflex buckles are lightweight, easily adjustable and have a large loading capacity which improves the overall strength and durability of the collar.\u003c\/p\u003e\u003cp\u003eLove your dog!\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 11 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Made with breathable airmesh and nylon hemming\u003c\/li\u003e\n\u003cli\u003e 3M reflective strips for better pet visibility \u0026amp; safety\u003c\/li\u003e\n\u003cli\u003e Ultra light zinc-alloy D ring for leash attachment\u003c\/li\u003e\n\u003cli\u003e Adjustable and comfortable to wear\u003c\/li\u003e\n\u003cli\u003e Extremely forgiving around the neck\u003c\/li\u003e\n\u003cli\u003e Eight sizes to fit any dog: XXS, XS, S, M, L, XL, XXL, XXXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Truelove","offers":[{"title":"XX-Small","offer_id":37826090860720,"sku":"TLC5011-BLUE-XXS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Small","offer_id":37826090893488,"sku":"TLC5011-BLUE-XS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Small","offer_id":37826090926256,"sku":"TLC5011-BLUE-S","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Medium","offer_id":37826090959024,"sku":"TLC5011-BLUE-M","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Large","offer_id":37826090991792,"sku":"TLC5011-BLUE-L","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Large","offer_id":37826091024560,"sku":"TLC5011-BLUE-XL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XX-Large","offer_id":37826091057328,"sku":"TLC5011-BLUE-XXL","price":1.99,"currency_code":"GBP","in_stock":true},{"title":"XXX-Large","offer_id":37826091090096,"sku":"TLC5011-BLUE-XXXL","price":1.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/vzah0dcpadw.jpg?v=1702919503"},{"product_id":"truelove-dog-puppy-collars-airmesh-reflective-pink-8-sizes","title":"Truelove Dog Puppy Collars Airmesh Reflective Pink 8 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eTruelove Dog Puppy Collars Airmesh Reflective Pink 8 Sizes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eTruelove durable dog collars feature soft, breathable air mesh fabric that is more comfortable for your dog to wear than a standard collar and is available in eight sizes and eleven different colours.\u003c\/p\u003e\u003cp\u003eThe unique design of these collars incorporates 3M scotchlite reflective strips for increased night time visibility and dog safety. All collars include an ultra light zinc-alloy D ring for leash attachment reducing the weight placed on your pets neck. Inside each collar is an information tag for writing your phone number on, in case your pet gets lost during a walk.\u003c\/p\u003e\u003cp\u003eSimple yet practical, the Truelove collars duraflex buckles are lightweight, easily adjustable and have a large loading capacity which improves the overall strength and durability of the collar.\u003c\/p\u003e\u003cp\u003eLove your dog!\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 11 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Made with breathable airmesh and nylon hemming\u003c\/li\u003e\n\u003cli\u003e 3M reflective strips for better pet visibility \u0026amp; safety\u003c\/li\u003e\n\u003cli\u003e Ultra light zinc-alloy D ring for leash attachment\u003c\/li\u003e\n\u003cli\u003e Adjustable and comfortable to wear\u003c\/li\u003e\n\u003cli\u003e Extremely forgiving around the neck\u003c\/li\u003e\n\u003cli\u003e Eight sizes to fit any dog: XXS, XS, S, M, L, XL, XXL, XXXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Truelove","offers":[{"title":"XX-Small","offer_id":37826091155632,"sku":"TLC5011-PINK-XXS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Small","offer_id":37826091188400,"sku":"TLC5011-PINK-XS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Small","offer_id":37826091221168,"sku":"TLC5011-PINK-S","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Medium","offer_id":37826091253936,"sku":"TLC5011-PINK-M","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Large","offer_id":37826091286704,"sku":"TLC5011-PINK-L","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Large","offer_id":37826091319472,"sku":"TLC5011-PINK-XL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XX-Large","offer_id":37826091385008,"sku":"TLC5011-PINK-XXL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XXX-Large","offer_id":37826091417776,"sku":"TLC5011-PINK-XXXL","price":1.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/p3og0yj11fv.jpg?v=1702919546"},{"product_id":"truelove-dog-puppy-collars-airmesh-reflective-grey-8-sizes","title":"Truelove Dog Puppy Collars Airmesh Reflective Grey 8 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eTruelove Dog Puppy Collars Airmesh Reflective Grey 8 Sizes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eTruelove durable dog collars feature soft, breathable air mesh fabric that is more comfortable for your dog to wear than a standard collar and is available in eight sizes and eleven different colours.\u003c\/p\u003e\u003cp\u003eThe unique design of these collars incorporates 3M scotchlite reflective strips for increased night time visibility and dog safety. All collars include an ultra light zinc-alloy D ring for leash attachment reducing the weight placed on your pets neck. Inside each collar is an information tag for writing your phone number on, in case your pet gets lost during a walk.\u003c\/p\u003e\u003cp\u003eSimple yet practical, the Truelove collars duraflex buckles are lightweight, easily adjustable and have a large loading capacity which improves the overall strength and durability of the collar.\u003c\/p\u003e\u003cp\u003eLove your dog!\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 11 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Made with breathable airmesh and nylon hemming\u003c\/li\u003e\n\u003cli\u003e 3M reflective strips for better pet visibility \u0026amp; safety\u003c\/li\u003e\n\u003cli\u003e Ultra light zinc-alloy D ring for leash attachment\u003c\/li\u003e\n\u003cli\u003e Adjustable and comfortable to wear\u003c\/li\u003e\n\u003cli\u003e Extremely forgiving around the neck\u003c\/li\u003e\n\u003cli\u003e Eight sizes to fit any dog: XXS, XS, S, M, L, XL, XXL, XXXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Truelove","offers":[{"title":"XX-Small","offer_id":37826092335280,"sku":"TLC5011-GREY-XXS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Small","offer_id":37826092368048,"sku":"TLC5011-GREY-XS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Small","offer_id":37826092400816,"sku":"TLC5011-GREY-S","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Medium","offer_id":37826092433584,"sku":"TLC5011-GREY-M","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Large","offer_id":37826092466352,"sku":"TLC5011-GREY-L","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Large","offer_id":37826092499120,"sku":"TLC5011-GREY-XL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XX-Large","offer_id":37826092531888,"sku":"TLC5011-GREY-XXL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XXX-Large","offer_id":37826092564656,"sku":"TLC5011-GREY-XXXL","price":1.99,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/svzgrstuv4n.jpg?v=1702919524"},{"product_id":"truelove-dog-puppy-collars-airmesh-reflective-brown-8-sizes","title":"Truelove Dog Puppy Collars Airmesh Reflective Brown 8 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eTruelove Dog Puppy Collars Airmesh Reflective Brown 8 Sizes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eTruelove durable dog collars feature soft, breathable air mesh fabric that is more comfortable for your dog to wear than a standard collar and is available in eight sizes and eleven different colours.\u003c\/p\u003e\u003cp\u003eThe unique design of these collars incorporates 3M scotchlite reflective strips for increased night time visibility and dog safety. All collars include an ultra light zinc-alloy D ring for leash attachment reducing the weight placed on your pets neck. Inside each collar is an information tag for writing your phone number on, in case your pet gets lost during a walk.\u003c\/p\u003e\u003cp\u003eSimple yet practical, the Truelove collars duraflex buckles are lightweight, easily adjustable and have a large loading capacity which improves the overall strength and durability of the collar.\u003c\/p\u003e\u003cp\u003eLove your dog!\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 11 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Made with breathable airmesh and nylon hemming\u003c\/li\u003e\n\u003cli\u003e 3M reflective strips for better pet visibility \u0026amp; safety\u003c\/li\u003e\n\u003cli\u003e Ultra light zinc-alloy D ring for leash attachment\u003c\/li\u003e\n\u003cli\u003e Adjustable and comfortable to wear\u003c\/li\u003e\n\u003cli\u003e Extremely forgiving around the neck\u003c\/li\u003e\n\u003cli\u003e Eight sizes to fit any dog: XXS, XS, S, M, L, XL, XXL, XXXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Truelove","offers":[{"title":"XX-Small","offer_id":37826093482160,"sku":"TLC5011-BROWN-XXS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Small","offer_id":37826093514928,"sku":"TLC5011-BROWN-XS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Small","offer_id":37826093547696,"sku":"TLC5011-BROWN-S","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Medium","offer_id":37826093580464,"sku":"TLC5011-BROWN-M","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Large","offer_id":37826093613232,"sku":"TLC5011-BROWN-L","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Large","offer_id":37826093646000,"sku":"TLC5011-BROWN-XL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XX-Large","offer_id":37826093711536,"sku":"TLC5011-BROWN-XXL","price":1.99,"currency_code":"GBP","in_stock":true},{"title":"XXX-Large","offer_id":37826093744304,"sku":"TLC5011-BROWN-XXXL","price":1.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/tdmonaxcye3.jpg?v=1702919510"},{"product_id":"truelove-dog-puppy-collars-airmesh-reflective-royal-blue-8-sizes","title":"Truelove Dog Puppy Collars Airmesh Reflective Royal Blue 8 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eTruelove Dog Puppy Collars Airmesh Reflective Royal Blue 8 Sizes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eTruelove durable dog collars feature soft, breathable air mesh fabric that is more comfortable for your dog to wear than a standard collar and is available in eight sizes and eleven different colours.\u003c\/p\u003e\u003cp\u003eThe unique design of these collars incorporates 3M scotchlite reflective strips for increased night time visibility and dog safety. All collars include an ultra light zinc-alloy D ring for leash attachment reducing the weight placed on your pets neck. Inside each collar is an information tag for writing your phone number on, in case your pet gets lost during a walk.\u003c\/p\u003e\u003cp\u003eSimple yet practical, the Truelove collars duraflex buckles are lightweight, easily adjustable and have a large loading capacity which improves the overall strength and durability of the collar.\u003c\/p\u003e\u003cp\u003eLove your dog!\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 11 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Made with breathable airmesh and nylon hemming\u003c\/li\u003e\n\u003cli\u003e 3M reflective strips for better pet visibility \u0026amp; safety\u003c\/li\u003e\n\u003cli\u003e Ultra light zinc-alloy D ring for leash attachment\u003c\/li\u003e\n\u003cli\u003e Adjustable and comfortable to wear\u003c\/li\u003e\n\u003cli\u003e Extremely forgiving around the neck\u003c\/li\u003e\n\u003cli\u003e Eight sizes to fit any dog: XXS, XS, S, M, L, XL, XXL, XXXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Truelove","offers":[{"title":"XX-Small","offer_id":37826094071984,"sku":"TLC5011-ROYALBLUE-XXS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Small","offer_id":37826094104752,"sku":"TLC5011-ROYALBLUE-XS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Small","offer_id":37826094137520,"sku":"TLC5011-ROYALBLUE-S","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Medium","offer_id":37826094170288,"sku":"TLC5011-ROYALBLUE-M","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Large","offer_id":37826094203056,"sku":"TLC5011-ROYALBLUE-L","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Large","offer_id":37826094235824,"sku":"TLC5011-ROYALBLUE-XL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XX-Large","offer_id":37826094268592,"sku":"TLC5011-ROYALBLUE-XXL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XXX-Large","offer_id":37826094301360,"sku":"TLC5011-ROYALBLUE-XXXL","price":1.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/m5nzje3kutl.jpg?v=1702919565"},{"product_id":"truelove-dog-puppy-collars-airmesh-reflective-green-8-sizes","title":"Truelove Dog Puppy Collars Airmesh Reflective Green 8 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eTruelove Dog Puppy Collars Airmesh Reflective Green 8 Sizes\u003c\/strong\u003e\u003c\/p\u003e\r\n\u003cp\u003eTruelove durable dog collars feature soft, breathable air mesh fabric that is more comfortable for your dog to wear than a standard collar and is available in eight sizes and eleven different colours.\u003c\/p\u003e\u003cp\u003eThe unique design of these collars incorporates 3M scotchlite reflective strips for increased night time visibility and dog safety. All collars include an ultra light zinc-alloy D ring for leash attachment reducing the weight placed on your pets neck. Inside each collar is an information tag for writing your phone number on, in case your pet gets lost during a walk.\u003c\/p\u003e\u003cp\u003eSimple yet practical, the Truelove collars duraflex buckles are lightweight, easily adjustable and have a large loading capacity which improves the overall strength and durability of the collar.\u003c\/p\u003e\u003cp\u003eLove your dog!\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 11 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Made with breathable airmesh and nylon hemming\u003c\/li\u003e\n\u003cli\u003e 3M reflective strips for better pet visibility \u0026amp; safety\u003c\/li\u003e\n\u003cli\u003e Ultra light zinc-alloy D ring for leash attachment\u003c\/li\u003e\n\u003cli\u003e Adjustable and comfortable to wear\u003c\/li\u003e\n\u003cli\u003e Extremely forgiving around the neck\u003c\/li\u003e\n\u003cli\u003e Eight sizes to fit any dog: XXS, XS, S, M, L, XL, XXL, XXXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Truelove","offers":[{"title":"XX-Small","offer_id":37826095841456,"sku":"TLC5011-GREEN-XXS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Small","offer_id":37826095874224,"sku":"TLC5011-GREEN-XS","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Small","offer_id":37826095906992,"sku":"TLC5011-GREEN-S","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Medium","offer_id":37826095939760,"sku":"TLC5011-GREEN-M","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"Large","offer_id":37826095972528,"sku":"TLC5011-GREEN-L","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"X-Large","offer_id":37826096005296,"sku":"TLC5011-GREEN-XL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XX-Large","offer_id":37826096038064,"sku":"TLC5011-GREEN-XXL","price":1.99,"currency_code":"GBP","in_stock":false},{"title":"XXX-Large","offer_id":37826096070832,"sku":"TLC5011-GREEN-XXXL","price":1.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/gqqjhmzcisa.jpg?v=1702919516"},{"product_id":"ancol-dog-puppy-coats-stormguard-chocolate-6-sizes","title":"Ancol Dog Puppy Coats Stormguard Chocolate 7 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Dog Puppy Coats Stormguard Chocolate 7 Sizes\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e The pragmatic Ancol Muddy Paws Stormguard Coat has been inspired by professional outdoor pursuits clothing. Designed to keep your dog comfortable in any and all weathers, it has a cosy fleece lining to insulate your dog from the cold, an enduring water-proof surface to help keep them dry and a chest protector strap to keep your dog's chest clean and dry if they run through a muddy puddle. \u003c\/p\u003e\u003cp\u003e The Ancol Stormguard Coat has a host of features to improve comfort and efficiency. These include an elasticated neck to allow for simple removal and a snug fit once on, elasticated back leg straps with Ancol branded studs, reflective edging tape to help your dog stay visible in the dark and a neck flap with 'Muddy Paws' stitching containing a handy lead slot for simple lead attachment and removal.\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 5 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Stormguard designed for outdoor all weather pursuits\u003c\/li\u003e\n\u003cli\u003e Elasticated neck and rear leg straps to allow for a snug fit\u003c\/li\u003e\n\u003cli\u003e All coats have reflective safety features\u003c\/li\u003e\n\u003cli\u003e Handy lead slot for simple lead attachment and removal\u003c\/li\u003e\n\u003cli\u003e 100% polyester - hand wash or gently machine wash in cool water\u003c\/li\u003e\n\u003cli\u003e Seven sizes to fit most dogs: XS, S, S\/M, M, L, XL, XXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Ancol","offers":[{"title":"X-Small","offer_id":37826121957552,"sku":"980180","price":12.49,"currency_code":"GBP","in_stock":true},{"title":"Small","offer_id":37826122023088,"sku":"980181","price":13.49,"currency_code":"GBP","in_stock":true},{"title":"Small\/Medium","offer_id":40832971014320,"sku":"980186","price":14.49,"currency_code":"GBP","in_stock":true},{"title":"Medium","offer_id":37826122055856,"sku":"980182","price":14.49,"currency_code":"GBP","in_stock":true},{"title":"Large","offer_id":37826122088624,"sku":"980183","price":15.49,"currency_code":"GBP","in_stock":true},{"title":"X-Large","offer_id":37826122121392,"sku":"980184","price":17.49,"currency_code":"GBP","in_stock":true},{"title":"XX-Large","offer_id":37826122154160,"sku":"980185","price":17.49,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/qrijlxovp2p.jpg?v=1734622834"},{"product_id":"ancol-dog-puppy-coats-stormguard-navy-blue-6-sizes","title":"Ancol Dog Puppy Coats Stormguard Navy Blue 7 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Dog Puppy Coats Stormguard Navy Blue 7 Sizes\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e The pragmatic Ancol Muddy Paws Stormguard Coat has been inspired by professional outdoor pursuits clothing. Designed to keep your dog comfortable in any and all weathers, it has a cosy fleece lining to insulate your dog from the cold, an enduring water-proof surface to help keep them dry and a chest protector strap to keep your dog's chest clean and dry if they run through a muddy puddle. \u003c\/p\u003e\u003cp\u003e The Ancol Stormguard Coat has a host of features to improve comfort and efficiency. These include an elasticated neck to allow for simple removal and a snug fit once on, elasticated back leg straps with Ancol branded studs, reflective edging tape to help your dog stay visible in the dark and a neck flap with 'Muddy Paws' stitching containing a handy lead slot for simple lead attachment and removal.\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 5 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Stormguard designed for outdoor all weather pursuits\u003c\/li\u003e\n\u003cli\u003e Elasticated neck and rear leg straps to allow for a snug fit\u003c\/li\u003e\n\u003cli\u003e All coats have reflective safety features\u003c\/li\u003e\n\u003cli\u003e Handy lead slot for simple lead attachment and removal\u003c\/li\u003e\n\u003cli\u003e 100% polyester - hand wash or gently machine wash in cool water\u003c\/li\u003e\n\u003cli\u003e Seven sizes to fit most dogs: XS, S, S\/M, M, L, XL, XXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Ancol","offers":[{"title":"X-Small","offer_id":37826122547376,"sku":"980159","price":12.49,"currency_code":"GBP","in_stock":true},{"title":"Small","offer_id":37826122580144,"sku":"980154","price":13.49,"currency_code":"GBP","in_stock":true},{"title":"Small\/Medium","offer_id":40832937361584,"sku":"980160","price":14.49,"currency_code":"GBP","in_stock":true},{"title":"Medium","offer_id":37826122612912,"sku":"980155","price":14.49,"currency_code":"GBP","in_stock":true},{"title":"Large","offer_id":37826122645680,"sku":"980156","price":15.49,"currency_code":"GBP","in_stock":true},{"title":"X-Large","offer_id":37826122678448,"sku":"980157","price":17.49,"currency_code":"GBP","in_stock":true},{"title":"XX-Large","offer_id":37826122711216,"sku":"980158","price":17.49,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/0eegtgurj5u.jpg?v=1734622838"},{"product_id":"ancol-dog-puppy-coats-stormguard-poppy-red-6-sizes","title":"Ancol Dog Puppy Coats Stormguard Poppy Red 7 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Dog Puppy Coats Stormguard Poppy Red 7 Sizes\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e The pragmatic Ancol Muddy Paws Stormguard Coat has been inspired by professional outdoor pursuits clothing. Designed to keep your dog comfortable in any and all weathers, it has a cosy fleece lining to insulate your dog from the cold, an enduring water-proof surface to help keep them dry and a chest protector strap to keep your dog's chest clean and dry if they run through a muddy puddle. \u003c\/p\u003e\u003cp\u003e The Ancol Stormguard Coat has a host of features to improve comfort and efficiency. These include an elasticated neck to allow for simple removal and a snug fit once on, elasticated back leg straps with Ancol branded studs, reflective edging tape to help your dog stay visible in the dark and a neck flap with 'Muddy Paws' stitching containing a handy lead slot for simple lead attachment and removal.\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 5 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Stormguard designed for outdoor all weather pursuits\u003c\/li\u003e\n\u003cli\u003e Elasticated neck and rear leg straps to allow for a snug fit\u003c\/li\u003e\n\u003cli\u003e All coats have reflective safety features\u003c\/li\u003e\n\u003cli\u003e Handy lead slot for simple lead attachment and removal\u003c\/li\u003e\n\u003cli\u003e 100% polyester - hand wash or gently machine wash in cool water\u003c\/li\u003e\n\u003cli\u003e Seven sizes to fit most dogs: XS, S, S\/M, M, L, XL, XXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Ancol","offers":[{"title":"X-Small","offer_id":37826123432112,"sku":"980148","price":12.49,"currency_code":"GBP","in_stock":true},{"title":"Small","offer_id":37826123464880,"sku":"980149","price":13.49,"currency_code":"GBP","in_stock":true},{"title":"Small\/Medium","offer_id":40832967344304,"sku":"980147","price":14.49,"currency_code":"GBP","in_stock":true},{"title":"Medium","offer_id":37826123497648,"sku":"980150","price":14.49,"currency_code":"GBP","in_stock":true},{"title":"Large","offer_id":37826123530416,"sku":"980151","price":15.49,"currency_code":"GBP","in_stock":true},{"title":"X-Large","offer_id":37826123563184,"sku":"980152","price":17.49,"currency_code":"GBP","in_stock":true},{"title":"XX-Large","offer_id":37826123595952,"sku":"980153","price":17.49,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/xlbubiryueu.jpg?v=1734622845"},{"product_id":"ancol-dog-puppy-coats-stormguard-pink-6-sizes","title":"Ancol Dog Puppy Coats Stormguard Pink 7 Sizes","description":"\u003cp class=\"largetext\"\u003e\u003cstrong\u003eAncol Dog Puppy Coats Stormguard Pink 7 Sizes\u003c\/strong\u003e\u003c\/p\u003e\u003cp\u003e The pragmatic Ancol Muddy Paws Stormguard Coat has been inspired by professional outdoor pursuits clothing. Designed to keep your dog comfortable in any and all weathers, it has a cosy fleece lining to insulate your dog from the cold, an enduring water-proof surface to help keep them dry and a chest protector strap to keep your dog's chest clean and dry if they run through a muddy puddle. \u003c\/p\u003e\u003cp\u003e The Ancol Stormguard Coat has a host of features to improve comfort and efficiency. These include an elasticated neck to allow for simple removal and a snug fit once on, elasticated back leg straps with Ancol branded studs, reflective edging tape to help your dog stay visible in the dark and a neck flap with 'Muddy Paws' stitching containing a handy lead slot for simple lead attachment and removal.\u003c\/p\u003e\u003cp\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e 5 colours, bold \u0026amp; stylish for all dogs\u003c\/li\u003e\n\u003cli\u003e Stormguard designed for outdoor all weather pursuits\u003c\/li\u003e\n\u003cli\u003e Elasticated neck and rear leg straps to allow for a snug fit\u003c\/li\u003e\n\u003cli\u003e All coats have reflective safety features\u003c\/li\u003e\n\u003cli\u003e Handy lead slot for simple lead attachment and removal\u003c\/li\u003e\n\u003cli\u003e 100% polyester - hand wash or gently machine wash in cool water\u003c\/li\u003e\n\u003cli\u003e Seven sizes to fit most dogs: XS, S, S\/M, M, L, XL, XXL\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Ancol","offers":[{"title":"X-Small","offer_id":37826123890864,"sku":"980349","price":12.49,"currency_code":"GBP","in_stock":true},{"title":"Small","offer_id":37826123923632,"sku":"980350","price":13.49,"currency_code":"GBP","in_stock":true},{"title":"Small\/Medium","offer_id":40832945553584,"sku":"980355","price":14.49,"currency_code":"GBP","in_stock":true},{"title":"Medium","offer_id":37826123956400,"sku":"980351","price":14.49,"currency_code":"GBP","in_stock":true},{"title":"Large","offer_id":37826123989168,"sku":"980352","price":15.49,"currency_code":"GBP","in_stock":true},{"title":"X-Large","offer_id":37826124021936,"sku":"980353","price":17.49,"currency_code":"GBP","in_stock":true},{"title":"XX-Large","offer_id":37826124054704,"sku":"980354","price":17.49,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0520\/0566\/6992\/products\/b5b2ex2nm5y.jpg?v=1734622841"}],"url":"https:\/\/realpetstore.co.uk\/collections\/new-products\/long-leads.oembed","provider":"Real Pet Store","version":"1.0","type":"link"}